Short answer
What does a solar company website include, and what does it cost?
A brochure site with the company, services and a survey form starts at ₺30,000 and goes live in about 3 days once content is ready. A site listing installed plants by kWp and province, with sections per roof type and a survey form that asks for the bill, runs from ₺50,000 and takes 1 week; a quote and project panel starts at ₺150,000.
Solar Energy, The search
Investors ask about their own roof, not panel brands.
Someone researching rooftop solar arrives with questions such as 'factory roof solar cost', 'how net metering works' or 'solar on farmland'. Panel and inverter brands come second; first they look at their own roof, their bill and the grid connection conditions.
So the site opens from the roof type: industrial roofs, agricultural irrigation, homes. At the end of each section the survey form asks for the roof type, approximate area, province and monthly consumption.
Solar Energy, From the field
A plant list with output and province.
Nobody can verify 'hundreds of projects completed'. We list each plant you have built as one row with kWp, province, roof type and commissioning date, and add photos where the client allows. The list grows from the panel, and an investor finds the job that looks like their own roof.