Skip to content
Tell us your project forpusyazilim@gmail.com

Istanbul, Türkiye, Mon-Fri 09:00-⁠18:00

Industrial & Machinery, Price, timeline, scope

Industrial & machinery company website

A technical buyer puts capacity, power and dimensions side by side. A firm that publishes its figures makes the shortlist; one that says 'call for details' does not.

from ₺30,0003 dayseverything is yours when the work is done

A laptop on a dark stone desk showing the SAGE Makine website
On screen: SAGE MakineIndustrial Machinery

Short answer

What does an industrial company website include, and what does it cost?

A brochure site with the company, product groups and contact starts at ₺30,000 and goes live in about 3 days once content is ready. A catalogue site with a page per model, technical tables and a quote form runs from ₺50,000 and takes 1 week; a panel where you manage products and tables, plus a catalogue generator, starts at ₺150,000.

Industrial & Machinery, The search

Buyers search for their problem, not your machine.

Two people arrive: the engineer who knows the model number, and the producer who only knows the problem ('removing stones from pistachios', 'ventilating a workshop'). The engineer looks for capacity, power and connection sizes; the producer wants to start from their own product or space.

So the catalogue has two doors: model pages with their figures, and application pages that start from the problem. Both lead to the same quote form, which carries the model the visitor viewed or the value they calculated.

Industrial & Machinery, On the phone

A table is data, not a picture.

A technical table stuck in a PDF or a screenshot cannot be searched or updated. We keep it in the panel row by row: airflow, pressure, power and dimensions are edited cell by cell and appear on the site as a table and a chart. Change one value and the catalogue, the model page and the quote form update together.

On screen: Antalya AVS Fan

Industrial & Machinery, Our work

Our work in this field

At Antalya AVS Fan, 52 technical tables and 176 airflow rows live in the panel; visitors calculate their airflow from area, height and air changes per hour, and the quote form carries the result. At SAGE Makine, visitors start from their own product (dried fruit, pistachios, pulses) and reach the right colour sorter or X-ray machine.

Industrial & Machinery, Price

From a product brochure to a panel-managed catalogue: three packages and their prices.

  • Company brochure site

    For: A manufacturer with a narrow range, winning work through introductions

    Price
    from ₺30,000Timeline: 3 days
    What it includes
    Company and plant page, product groups, certificates, quote form, address and map, privacy notice
    Leave a note for this package
  • Technical catalogue site

    For: A firm with model-by-model products, trade fairs and export

    Price
    from ₺50,000Timeline: 1 week
    What it includes
    A page and technical table per model, application pages, downloadable documents, a quote form that carries the product, optional second language
    Leave a note for this package
  • Panel-managed catalogue and calculator

    For: A producer who wants to update products and tables in-house

    Price
    from ₺150,000Timeline: 1 month+
    What it includes
    A panel for products, tables and photos, a selection or capacity calculator, a PDF catalogue generator, quote records
    Leave a note for this package

Excl. VAT, half at the start, half on approval, fixed in the written proposal

Industrial & Machinery, Watch for

What to ask before you commission an industrial site

  • Who keeps control of the technical tables?

    If product figures live in the agency's files, every new model means writing to them. Check the proposal says tables are kept in the panel as data you add and correct yourself, and that your engineers check the values during migration.

  • Are the old addresses kept?

    Product pages that have sat in Google for years, and links your dealers gave out, open at the old addresses. If each old address is not redirected to its counterpart, those links land on an empty page. At AVS Fan, each of the 62 indexed addresses opens at its old path.

  • Does uploading photos slow the site down?

    A photo taken in the plant arrives at 5-⁠10 MB; if the panel publishes it as is, the product page will not open on a phone on site. Ask whether the panel resizes uploads and creates a light copy by itself.

Industrial & Machinery, Process

No screen gets coded before you approve it.

  1. 01

    A 20-minute call

    We talk through what you need; the written proposal arrives the next day.

  2. 02

    Content

    We take your catalogue, data sheets and the tables on your old site and move them into the panel row by row; your engineers check the values.

  3. 03

    Screens and approval

    You see every screen first; code is written only after you approve.

  4. 04

    Launch and handover

    The domain and accounts are opened in your name; once payment is complete, the code and every login are handed over.

Industrial & Machinery, Questions

Asked before the proposal

We export. Can the site be in English too?

Yes. Each language gets its own address and shows up in searches in that language. Translations of technical terms go to your engineers for approval, and units come from the same table in both languages.

How do we bring buyers we met at a trade fair to the site?

The QR code on your stand catalogue and business cards opens the relevant model page directly. Back at their desk, the buyer finds the same machine with its figures and fills in the quote form with the model already selected.

Do we have to publish prices?

No. Machine prices depend on configuration. The site's job is to help the buyer find the right model before asking for a price, and the form asks for the model, capacity and use so the enquiry reaches you ready to quote.

Can our dealers have their own listing?

A dealer page filtered by province and country is built in, and you update it from the panel. If dealers need their own price or stock screen, that is a separate job in the panel band.

Industrial & Machinery, Proposal

Written price, next day.

A 20-minute call about what you need; the written proposal arrives the next day. Half of the payment at the start, half once the work is done and approved.

  1. 0120-minute call
  2. 02Written proposal the next day
  3. 03Half at the start, half on approval
What do you need? optional

When? optional
Anything to add optional

The note we will receive

The note builds here as you pick.

Your data is processed under our KVKK notice and privacy policy (Turkish).

Call WhatsApp